✨ New Arrivals Just Dropped!Explore
HomeStore

Arsenio Oval Crystal Chandelier

Product image 1
Product image 2
Product image 3
Product image 4
Product image 5
Product image 6

Arsenio Oval Crystal Chandelier

Arsenio Oval Crystal Chandelier

The brushed gold finish and uneven ribbed clear glass rods lend a transitional feel to this modern design. Add this chandelier above your dining table or coffee table to give your room a unique and luxurious feel.

Type: Modern Chandelier
Size:Length 60 cm ( 23.6 in ) x Width 30 cm ( 11.8 in ) x Height 30 cm ( 11.8 in )
Length 80 cm ( 31.5 in ) x Width 30 cm ( 11.8 in ) x Height 30 cm ( 11.8 in )
Length 100 cm ( 39.4 in ) x Width 30 cm ( 11.8 in ) x Height 30 cm ( 11.8 in )
Hanging Wire Length: Up To 50" (Adjustable)
Finish: Polished, Electroplated
Material: Stainless Steel, K9 Crystals
Type of Bulb:LED Strip
Dimmer Switch Compatible: Yes
Voltage: 110-240V
Warranty: 2 year
Power Source: Hardwire; professional installation recommended
Certification: UL/CE/SAA
Note:Wipe with a soft, damp cloth; avoid the use of all cleaners and abrasives, as they will damage the finish
Delivery time: 3-15 working days.

Select Size
Select Emitting Color
From $243.60

Original: $811.99

-70%
Arsenio Oval Crystal Chandelier

$811.99

$243.60

Product Information

Shipping & Returns

Description

The brushed gold finish and uneven ribbed clear glass rods lend a transitional feel to this modern design. Add this chandelier above your dining table or coffee table to give your room a unique and luxurious feel.

Type: Modern Chandelier
Size:Length 60 cm ( 23.6 in ) x Width 30 cm ( 11.8 in ) x Height 30 cm ( 11.8 in )
Length 80 cm ( 31.5 in ) x Width 30 cm ( 11.8 in ) x Height 30 cm ( 11.8 in )
Length 100 cm ( 39.4 in ) x Width 30 cm ( 11.8 in ) x Height 30 cm ( 11.8 in )
Hanging Wire Length: Up To 50" (Adjustable)
Finish: Polished, Electroplated
Material: Stainless Steel, K9 Crystals
Type of Bulb:LED Strip
Dimmer Switch Compatible: Yes
Voltage: 110-240V
Warranty: 2 year
Power Source: Hardwire; professional installation recommended
Certification: UL/CE/SAA
Note:Wipe with a soft, damp cloth; avoid the use of all cleaners and abrasives, as they will damage the finish
Delivery time: 3-15 working days.